We've been kind of baby-centric so here's a little diversion.
One of the main reasons I got this particular property was to be able to build a workshop on it. It took about 6 months to get the permit, and ground was finally broke in Nov of '05. As most construction projects go, it took longer than anticipated, and wasn't complete until Aug of '06. Huge Thanks to my friend Tom in LA who came down here, and helped me with the assembly of the metal building.
Here's a few specs on the building:
36' W x 48' H (1728 sq ft)
18' Peak Height, 12' Eave Height
10' x 10' Door Openings (3)
Steel and Wood Framing
240V, 1-Ph, 100A Electrical Service
Showing posts with label Workshop. Show all posts
Showing posts with label Workshop. Show all posts
Saturday, February 6, 2010
Subscribe to:
Posts (Atom)